Vertical Wells With Flowjet®

FlowJet technology for vertical and deviated wells Production Logging Service is applied on “opportunity basis” at failed BP, PCP, ESP replacement workover.

When WO rig is sent to the well to replace failed AL pump, FlowJet to be run into the well, production logging survey is performed in a flowing mode through FlowJet® pump. After completion of MPLT, a workover rig can proceed with reservoir optimisation such as WSO, perforation, stimulation, zone plug-off and so on.

  • PLT in Artificially lifted wells.
  • No Y-tool required.
  • Variable rate.
  • Logging on opportunity basis at failed AL replacement.
  • Immediate result for workover continuation.
  • Cost-effective solution.