FlowJet technology for horizontal wells Production Logging Service is applied on “opportunity basis” at failed BP, PCP, ESP replacement workover.
When WO rig is sent to the well to replace failed AL pump, FlowJet® with provision for CTU to be run into the well, production logging survey is done in flowing mode through FlowJet® pump. After completion of MPLT workover rig could proceed with reservoir optimisation such as WSO, perforation, stimulation, zone plug-off and so on.
- PLT in Artificially lifted horizontal wells.
- No Y-tool required.
- Variable rate.
- Logging on opportunity basis at failed AL replacement.
- Immediate result for workover continuation.
- Provided with GODEC Energy Array Logging suite.
- Cost-effective solution.